FORUM8 Design Festival 2012-3Days
No charge to participate. * is a required fileld. Please set the JavaScript to be effective when inputting this form below.
Input the users information
Company Name*
TEL*
FAX
E-mail*
E-mail(Re-enter)*
Department
Participant's Name*
Remarks
(Document requests etc.)
Free e-mail service
We are providing
free e-mail service.
Would you like to recieve the e-mail service?
Yes
No
Name of sales staff
Would you tell us the name of our sales staff who introduced about Design Festival?
Please tick the box you want to participate.
●
"The 11th 3D/VR Simulation Contest on CLoud"
The 11th 3D/VR Simulation Contest on Cloud
Award Ceremony
The 6th Design Conference
Geotechnical Analysis Sessions
10:00-12:00 (Start accepting 9:30)
CPD 0.8
"Utilization of cloud computing VR and SNS and their future vision"
The 11th 3DVR Simulation Contest on Cloud : Award Ceremony
10:00-12:00 (Start accepting 9:30)
CPD 2.0
"Adaption of geotechnical dynamic analysis including liquefaction analysis and its application"
"New features of geotechnical analysis series products and the development plan of "GeoEnergy""
"Analysis case of peripheral filling for tunnel excavation via GeoFEAS"
Lunch
12:00-13:00
Lunch Premium members are invited. *Participants in both morning and afternoon are invited.
The 13th UC-win/Road Conference
Driving Simulation Sessions
The 6th Design Conference
Geotechnical Analysis Sessions
13:00-15:00
CPD 2.0
"Simulation utilized for a research on the mechanism of predicting danger while driving on the road"
"Driver behavior analysis using a driving simulator for the development of ASV"
"Expansion of driving simulation feature and future developments"
13:00-15:00
CPD 2.0
"Landslide and liquefaction phenomenon caused by an earthquake and the analysis on their reproduction"
"Introduction of an analysis using GeoFEAS to tackle the problem of displacement stability of infrastructure constructed adjacent to RC building"
"Analysis case via UWLC and GeoFEAS"
15:15-17:30
CPD 2.3
"Case study of VR in the development of Advanced Driver Assistance System"
"Mobile mapping system and automatic data creation in VR space"
"Application of VR technology in traffic safety in China and the future vision"
17:30-19:30
Special party for the 25th anniversary of the FORUM8's foundation & launch party
9/20 10:00-17:00
FORUM8 Technical Support (9/20)
Desired Time:
:
Product Name :
Question:
Civil/Analysis Sessions
Architecture/BIM Session
10:00-12:00 (Start accepting 9:30)
CPD 2.0
"Geotechnical analysis and the front line of geothermal heat energy development"
"Developing a technology for reducing the damage potentially inflicted by a disaster by an experiment of fracturing life size structure using E-Defence"
"Revision of specifications for highway bridges and the future development of FORUM8's products"
10:00-12:00 (Start acceting 9:30)
CPD 2.0
"Architecture/Information/Design technology"
"Utilization of UC-win/Road for BIM"
"BIM Solution, 3D/VR Engineering Service”-Allplan, UC-win/Road, DesignBuilder, and other various technical services"
Lunch
12:00-13:00
Lunch Premium members are invited. *Participants in both morning and afternoon are invited.
Civil General Sessions
Hydraulic engineering sessions
13:00-15:10
CPD 2.2
"Trend of information transmission revolution and Cloud, and our mission"
"Latest features of VR-Cloud® and its future technical development"
"Utilization of High-performance computing on cloud® and UC-1 for SaaS"
"Designing large-scale junction using UC-win/FRAME(3D)"
13:00-15:10
CPD 2.2
xpswmm users meeting
"Issue of disaster caused by heavy rainfall and flood analysis technology"
“Risk assessment on Urban Rain water drainage using xpswmm”
“Current status and issue of predicting damage done by flood including the affected water quality in Hue, Vietnam”
15:25-17:15
CPD 1.8
"Example of nonlinear dynamic analysis on waterworks facility using Engineer's Studio®”
"Research related to ultimate strength and destruction process of bridge using Engineer's Studio®"
"New Engineer's Studio® that supports Revision of Specifications for Highway Bridges and analysis support service"
15:25-17:15
CPD 2.1
“Case Study of tsunami and inundation analysis using xpswmm”
“Rapid Inundation Modelling using a GPU Solver of the Full 2D Long Wave Equations”
“Method of utilizing water works analysis and the future vision”
“Waterworks series and proposal of an analysis with xpswmm application”
9/21 10:00-17:00
FORUM8 Technical Support (9/21)
Desired Time:
:
Product Name :
Question: