* Please note: 1 man-day = 30,900yen and time estimates do not include re-editing work.
Model |
|
Number of Elements |
Number of Polygons |
Estimated man-days |
Model Type |
Bridge model |
 |
50,000yen |
70 |
1,736 |
1.5 |
Arch brigde |
 |
30,000yen |
20 |
2,676 |
1.5 |
PC Arch bridge |
 |
50,000yen |
60 |
4,052 |
2.0 |
Arch bridge |
 |
20,000yen |
20 |
876 |
1.5 |
Arch bridge |
 |
45,000yen |
120 |
8,116 |
1.0 |
Overpass |
 |
20,000yen |
15 |
882 |
1.5 |
Animated Display
Setting operation |
 |
30,000yen |
15 |
13,924 |
0.5 |
Stairs
(No drawings necessary) |
 |
40,000yen |
20 |
1,366 |
0.5 |
Front and Rear of train
(modeled from a drawing) |
 |
90,000yen |
100 |
15,372 |
4.0 |
Underground structure
(modeled from a drawing) |
 |
25,000yen |
50 |
3,062 |
0.5 |
Gate
(modeled from a photo) |
Reference(Setting for a model of operation) |
 |
90,000yen |
500 |
39,599 |
2.0 |
Truss bridge
(modeled from a drawing
and can express pavement details) |
 |
120,000yen |
200 |
72,329 |
9.0 |
Storage facilities |
 |
150,000yen |
260 |
35,107 |
2.0 |
Tunnel construction |
|