* Please note: 1 man-day = 30,900yen and time estimates do not include re-editing work.
Model   Number of
Elements
Number of
Polygons
Estimated
man-days
Model Type
Bridge model
50,000yen 70 1,736 1.5 Arch brigde
30,000yen 20 2,676 1.5 PC Arch bridge
50,000yen 60 4,052 2.0 Arch bridge
20,000yen 20 876 1.5 Arch bridge
45,000yen 120 8,116 1.0 Overpass
20,000yen 15 882 1.5 Animated Display
Setting operation
30,000yen 15 13,924 0.5 Stairs
(No drawings necessary)
40,000yen 20 1,366 0.5 Front and Rear of train
(modeled from a drawing)
90,000yen 100 15,372 4.0 Underground structure
(modeled from a drawing)
25,000yen 50 3,062 0.5 Gate
(modeled from a photo)
Reference(Setting for a model of operation)
90,000yen 500 39,599 2.0 Truss bridge
(modeled from a drawing
and can express pavement details)
120,000yen 200 72,329 9.0 Storage facilities
150,000yen 260 35,107 2.0 Tunnel construction