Home Back
Support/Service

   

Input Support Service for 3D Laminated plates and various Crack models
Service Start : 2009.03
  Systems Development/Data Service・Maintenance Support
Engineer's Studio Product page
Engineer's Studio®
Product Page

Engineer's Studio Analysis Support Service
Engineer's Studio®
WEB Quote Service

OverviewPrice/Purchase

   Engineer's Studio® Analysis Support Service Standard Quote   (All prices do not incl. tax)
ライン

Engineer's Studio® Analysis support service standard quotation
● Modeling data creation basic labor rate
  (Nodes = 50 nodes or less. Cross-section = 20 elements or less)  Based on the 1-wave/1-direction model
Technician Type
Ratio Rate Price Total
Chief engineer 20% $553.00 $110.60
Technician A 30% $487.00 $146.10
Technician B 30% $406.00 $121.80
Technician C 10% $327.00 $32.70
Engineers 10% $279.00  $27.90
(A) Modeling data creation basic labor rate $439.10 USD

● Model creation time
Frame Creation Unit Time Remarks
Node Creation Less than 500 0.020  
500 or more 0.014  
Section Creation Elements Less than 150 0.100  
150 or more 0.070  
Fiber Element set time 0.100  
Plate Element set time 0.100  
Load Settings Unit Time Remarks
Setting of inertial force coefficient
during static analysis on a case basis
0.15 1 unit is 1 case
(Because it is a simple setting function, it is counted as one case per direction, ← → ↑ ↓, 4 directions)
Static analysis with respect to various loads 1.00 Per Case
(Because there is no simple setting function, it is counted as one case per side)
Dynamic Analysis - Tremor 0.10 1 case per seismic activity
(1 case is 1 direction/ seismic activity)
Coefficient based on the number of created models
(when the whole model remains unchanged)
0.20  
(B) Model Creation Time    

● Direct Labor Cost
(C) Total(C)(A)(B)

● General and Administrative Expenses (120% of Direct Labor) 
※When direct labor cost is below 50,000 JPY,
a fixed cost of 60,000 JPY will be charged as a minimum administrative cost.
(D) General and administrative expenses

● Expenses
 Report OP
 Arrangement of Results
 Technical Expenses
 Express Delivery Fee(25% -Priority, Overtime, etc.)
(E) Misc. Expense Subtotal

● Consumption Tax
(F) Consumption Tax

● Estimated Total
(C)(D)(E)(F)


 Required materials at the time of ordering
Schedule of planned data creation (provided as necessary. Clarification of desired delivery date, and electronic data availability).
1. Plan view 2. Cross-sectional view 3. Structural drawing 4. Reinforcement drawing 5. Structural calculation sheet 6. Node / element data (framework analysis result) 7. Other materials necessary for modeling
 Delivery date
Complete delivery / confirm delivery details
Engineer's Studio® data and materials created at the time of data creation are delivered at the same time.
 Maintenance and Customer Support
One year of tech support and free repair. After a year, you can contact us here.
(Reference:Maintenance Support Contact


  Product Purchase/Contact Information
ライン

Order(Purchase)
You can also use credits or purchase with the installment payment system.
If you have any questions, please contact the Upgrade Center. (vc@forum8.co.jp

Contact Us If you have any questions in general, please feel free to contact us at forum8@forum8.co.jp
Page Top Page Top

FORUM8