Engineer's Studio®
Analysis Support Service Standard Quote |
(All prices do not incl.
tax) |
|
|
■Engineer's Studio® Analysis support service
standard quotation |
|
● Modeling data
creation basic labor rate
(Nodes = 50 nodes or
less. Cross-section = 20 elements or less) Based on the
1-wave/1-direction model |
Technician Type
|
Ratio |
Rate Price |
Total |
Chief engineer |
20% |
$553.00 |
$110.60 |
Technician A |
30% |
$487.00 |
$146.10 |
Technician B |
30% |
$406.00 |
$121.80 |
Technician C |
10% |
$327.00 |
$32.70 |
Engineers |
10% |
$279.00 |
$27.90 |
(A) Modeling
data creation basic labor rate |
$439.10 USD
|
|
|
●
Model creation time |
Frame Creation |
Unit Time |
Remarks |
Node
Creation |
Less than 500 |
0.020 |
|
500 or more |
0.014 |
|
Section
Creation Elements |
Less than 150 |
0.100 |
|
150 or more |
0.070 |
|
Fiber
Element set time |
0.100 |
|
Plate
Element set time |
0.100 |
|
Load Settings |
Unit Time |
Remarks |
Setting of
inertial force coefficient
during static analysis on a case basis |
0.15 |
1 unit is 1 case
(Because it is a simple setting function, it
is counted as one case per direction, ← → ↑ ↓,
4 directions) |
Static
analysis with respect to various loads |
1.00 |
Per Case
(Because there is no simple setting
function, it is counted as one case per side) |
Dynamic
Analysis - Tremor |
0.10 |
1 case per seismic
activity
(1 case is 1 direction/ seismic activity) |
Coefficient based on the number of created
models
(when the whole model remains unchanged) |
0.20 |
|
(B) Model
Creation Time |
|
|
|
|
● Direct Labor
Cost |
(C) Total(C)=(A)
X (B) |
|
|
● General and
Administrative Expenses (120% of Direct Labor)
※When direct labor cost is below 50,000
JPY,
a fixed cost of 60,000 JPY will be charged
as a minimum administrative cost. |
(D) General
and administrative expenses |
|
|
● Expenses |
Report OP |
Arrangement of Results |
Technical Expenses |
Express
Delivery Fee(25% -Priority, Overtime, etc.) |
(E) Misc.
Expense Subtotal |
|
|
●
Consumption Tax |
(F) Consumption
Tax |
|
●
Estimated Total |
(C)+(D)+(E)+(F) |
|
|
Required materials
at the time of ordering |
Schedule of planned data
creation (provided as necessary. Clarification
of desired delivery date, and electronic data
availability).
1. Plan view 2. Cross-sectional view 3.
Structural drawing 4. Reinforcement drawing 5.
Structural calculation sheet 6. Node / element
data (framework analysis result) 7. Other
materials necessary for modeling |
|
|
Delivery date |
Complete delivery /
confirm delivery details
Engineer's Studio® data and materials
created at the time of data creation are
delivered at the same time. |
|
|
Maintenance and
Customer Support |
One year of tech support
and free repair. After a year, you can contact
us here.
(Reference:Maintenance
Support Contact) |
|